This project is completed. Project listed for the 2007-08 Rotary Year. The Matching Grant application number from TRF is #58859.
Matching Grant awarded in 2006 is equal to $33,700.
Additional Outside Funding (not matched by TRF)includes $25,021 from CARE International in Tajikistan, as $2,955 cash contribution of Dahana villagers; and $44,530 as in-kind contribution form benefitting villages.
<15-Dec-06> System Entry
Creation of project page.
<1-May-08> by Sabina
Status of Projects managed cooperatively by CARE, Intelligentsia and Rotary
Water systems were successfully constructed in seven villages in the Varzob district (one more than originally planned). In every village a WUA was established and training programs were completed. These projects are completed.
*******
Status of Project managed by Intelligentsia and Rotary:
- RC Dushanbe formed a Water Project Sub-Committee;
- On July 16, 2006 Water Project Sub-Committee members had a meeting with Yovon District Administration officials and received confirmation that the project was going to receive support from the local government;
- On April 8, 2007 after the arrival of funds from TRF, the Village Working Committee was formed. It consists of three core persons who are responsible for organizing villagers for work, logistics (project supplies transportation and storage), and accounting for the village’s contributions.
- The Dahana project design documents were prepared by Intelligentsia International, approved by RC Dushanbe and delivered to the designated village representative; all necessary paperwork/approvals were received from the respective authorities (Water Department, Sanitary Station, Power Department);
- Construction work on component (a) of Dahana village project was completed: electrical wiring for the pump station was connected to main power line, the pump station shelter was completed; a transformer was installed, the pump/motor was tested and proved to be working fine;
- On September 22, 2007 the Water Project Sub-Committee and other members of RC Dushanbe (all together 15 Rotarians) visited Dahana for a meeting with villagers. The achievements so far, current issues and challenges and further plans were discussed.
<2-May-08> System Entry
Grant paperwork sent to The Rotary Foundation.
<2-May-08> System Entry
Grant approved by The Rotary Foundation.
<23-Nov-08> by Sabina
On July 3 two contracts were signed: for supplying pipes and materials and for wiring and installing delivery and distribution pipes.
Early November pipes are fully installed and village is supplied with water.
<16-Jul-09> System Entry
Grant status changed to "Completed".
<16-Jul-09> by John Capece
final report posted to www.CentralAsiaWater.org
|